top of page
before image addition bala cynwyd, lower merion
construction demolition addition
remodeling, foundation, concrete block, radiant heat
rough plumbing, careful layout of plumbing in concrete slab
radiant heat in slab, residential radiant heat

We were doing radiant heat in the 80's

Careful layout is essential when the pipes will be buried under concrete and radiant heating pipes

This addition added 1200 square feet to this home.  This was one of my first radiant heat installations.  It was installed in the 80's and works perfectly today.

whole house renovation in haverford, lower merion township, siding, roofing, slate roof, kitchen, bath, addition, tudor style
pool house gladwyne, sub zero and wolf kitchen, new contruction, cedar roof, stone work, ipe deck, skylighs
pool house floor inlay
large addition, gladwyne, lower merion township, philadelphi suburb construction advice

This was a very elegant pool house with a full kitchen with sub zero refrigerator and wolf range and two bathrooms with two changing rooms

The interior was tiled for durability with those wet feet running through.  Note the custom glass inlay in the floor.  It was custom designed and installed by me.

The beautiful addition was designed for my clients 30 x 50 beautiful Persian rug.  We used structural steel to get the large open span required to fit the rug.

round cone addition, wynnewood, lower merion township, hot tub, stone work, solar heat,

Both of these homes were completely remodeled including new kitchens, baths, windows, mechanical systems and more

powder room wynnewood, tie floo, tile inlay, design build
ardmore kitchen remodel, curly maple and purple heart
100 kilowatt generator, gladwyne, whole house remodel
custom master bath, arched mirrors, dual vanities, custom tile work
andrew stein craftsman, jewelry box, bala cynwyd
custom bath, white bath, comtemporary bath, penn valley, lower merion township
andrew stein on backhoe, additions,remodeling, radnor township, devon
marble slabs for powder room, gladwyne
construction , remodeing, fire damage, wynnewood, before and after
fire damage, lower merion township, after

A spark from a train caught the roof of this home on fire.  We rebuilt the roof and renovated the damaged areas of the home.  It came out better than new.

During a very extensive whole house renovation we installed a 100 kilowatt generator.  It was so heavy we need a crane to place it.

We specialized in kitchen and bathroom remodeling.  There are a lot of details in these rooms.  The marble powder room was built with slabs of marble

cork floor, kitchen remodel. lower merion township

This cork floor was soft under the feet

custom tile work narberth, pa.
tile border, bath remodel, bryn mawr, pa., construction planning, design build,
tile work, major remodel. antique tile
stained glass, custom made, craftsman,construction expert
custom bath remodel, gladwyne, pa. , radiant heat, round ceiling

I like working in different mediums.  I always loved a nicely detailed floor.  The glass mandala is a replica of a floor inlay in a pool house we built.

I always like building things in my spare time.  This is a jewelry box I made for my wife.

bottom of page